Work-for-WYDOT.png
Search another route:           

Travel information for US Highway 20 is as follows:

New Feature


Frequently Asked Questions Closures & Advisories
Search Conditions By Map
Search By City
Search By District
Variable Speed Limits
Chain Law
Neighboring States

District Comments
District 2 (Central) I25: Planned Closure for roadwork June 9-12, 2026 from 8pm to 6am, all lanes will be closed near Casper from milepost 180 to 196.

District 5 (Northwest) mm 124 on us 191 8-10 30 foot secton of fence


Conditions
Route Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Cody
NWS Forecast
Between Pahaska and the Shoshone National Forest Boundary Dry Falling Rock None Jun 8, 2026, 06:32 PM    
Between the Shoshone National Forest Boundary and Cody Dry Falling Rock None Jun 8, 2026, 06:32 PM   Cody (West)  
Between Cody and the Big Horn County Line Dry None None Jun 8, 2026, 06:32 PM   Eagle Pass  
Basin
NWS Forecast
Between the Big Horn County Line and 4 miles west of Greybull Dry None None Jun 8, 2026, 06:32 PM   US 14/16/20 / WYO 32 Junction  
Between 4 miles west of Greybull and Greybull Dry None None Jun 8, 2026, 06:32 PM   Greybull (South)  
Between Greybull and Basin Dry None None Jun 8, 2026, 06:32 PM   Greybull (South)  
Between Basin and MM 176, Washakie/Big Horn County Line Dry None None Jun 8, 2026, 06:32 PM   Manderson  
Worland
NWS Forecast
Between Washakie/Big Horn County Line and Worland Dry None None Jun 8, 2026, 06:32 PM   Worland (South)  
Between Worland and Mile Marker 148, Washakie/Hot Springs County Line Dry None None Jun 8, 2026, 06:32 PM   Worland (South)  
Thermopolis
NWS Forecast
Between Mile Marker 148, Washakie/Hot Springs County Line and Thermopolis Dry None None Jun 8, 2026, 06:32 PM   Kirby Junction  
Between Thermopolis and Boysen Dam Dry Falling Rock US 20 BUS/WY 789 from milepost 116.100 to 116.500
Width restriction: 12 ft
Height restriction: 15 ft
Jun 8, 2026, 06:32 PM   Boysen Dam Wind River Canyon Thermopolis (South)  
Shoshoni
NWS Forecast
Between Boysen Dam and Shoshoni Dry None None Jun 8, 2026, 06:32 PM   Shoshoni (North) Boysen Dam  
Between Shoshoni and Moneta Dry None None Jun 8, 2026, 06:32 PM   Moneta Shoshoni (North)  
Between Moneta and Waltman Dry None None Jun 8, 2026, 06:32 PM   Waltman Hiland   Hiland
Casper
NWS Forecast
Between Waltman and Casper Dry None None Jun 8, 2026, 07:36 PM   Natrona   Natrona
Between Casper and Glenrock Dry None None Jun 8, 2026, 07:36 PM     Hat Six
Douglas
NWS Forecast
Between Glenrock and Douglas Dry None None Jun 8, 2026, 07:36 PM   Natural Bridge Interchange Deer Creek   Deer Creek Hat Six
Between Douglas and I-25, Orin Jct Dry None None Jun 8, 2026, 07:36 PM   Orin Junction East Douglas  
Between I-25, Orin Jct and Lost Springs Dry None None Jun 8, 2026, 07:36 PM    
Lusk
NWS Forecast
Between Lost Springs and Lusk Dry None None Jun 8, 2026, 07:36 PM   Lusk  
Between Lusk and the Nebraska State Line Dry None None Jun 8, 2026, 07:36 PM   Duck Creek Van Tassell   Van Tassell

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Road Milepost(s) Surface Delays Last Updated
Road work near Casper I-25 mm 186-188 Road Work Tim Rasnake
307-322-6500
None Apr 17, 2026 Jun 30, 2028 Reconstruction (1 bridge, and 5 overhead sign structures), bridge replacement (2 structures),replace water and sewer mains, and enhancements; Involving placing concrete pavement, installing median barrier, placing road base, installing shoulder barrier, applying pavement markings, erecting structural steel, placing MSE wall, excavation, replacing overhead sign structures, removing concrete pavement, placing structural concrete, and installing traffic signal system on I-25 beginning at RM 187.99 at the Casper Marginal (McKinley - Yellowstone Section) for approximately 2.0 miles in Natrona County.______________________

I25

US20

US87

US26

187 to 189 Paved Construction zone speed limit 45 MPH Apr 22, 2026, 07:33 PM
Yellowstone National Park - Cody, Palisades Section N311107 None Mountain Construction Company
Lovell , WY
307-548-7186
May 1, 2026 Oct 31, 2026 Overlay and Chip Seal with slope flattening, guardrail repair and drainage work on approximately 9.85 miles on US 14/16/20 beginning at RM 10.249 and ending at RM 20.102.

US20

17THST

GREYBULLHWY

SHERIDANAVE

US14

US16

YELLOWSTONEHWY

WY120

8THST

10.25 to 20.1 Paved 20 minute delays with stopped conditions May 4, 2026, 11:11 AM
Road Work WY 14/16/20 WY 310 MP 205.29 - 211.65 Maintenance Operations: Chip Seal None None Jun 8, 2026 Jun 15, 2026 Chip seal

WYELLOWSTONEHWY

6THST

MAINST

BIGHORNAVE

S6THST

N10THST

E2NDST

US26BUS

W1STST

US87

WY789

I25BUS

US20

N6THST

US14

3RDSTE

US87BUS

SHOSHONIST

IDAHOST

US310

4THST

US20BUS

US26

PARKST

ASHST

US16

E1STST

US14A

205.29 to 211.65 Paved 15 minute delays May 28, 2026, 07:46 AM
Waltman - Shoshoni B265002 Erik Smith
307-332-4151
erik.smith@wyo.gov
McGarvin-Moberly Construction Co.
Worland , WY
307-347-4268
May 25, 2026 Jul 31, 2026 Asphalt paving overlay and chip seal on 47 miles of US 20/26

US20

US20BUS

50.59 to 97.5 Paved 15 minute delays with stopped conditions Jun 8, 2026, 04:09 PM
*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.