Search another route:           

Travel information for US Highway 191 is as follows:

Last update at: Sep 28, 2021 01:06 am
Frequently Asked Questions Closures & Advisories
Search Conditions By Map
Search By City
Search By District
Variable Speed Limits
Chain Law
Neighboring States

District Comments
District 3 (Southwest) WY22: Weight limit of 60,000 GVW in effect and brake checkpoints over Teton Pass between Jackson and the Idaho state line, from milepost 7 to 17.

WY390: Vehicle Restrictions in effect near Jackson at milepost 7.7. Narrow road. No vehicles over 23 ft. 4 in. length and over 8 ft. 4 in width. No trailers allowed. Use alternate route.

US189: Loose gravel on road, motorcycles use caution between La Barge and Kemmerer from milepost 70 to 72.

WY372: Livestock near highway near La Barge at milepost 39, Proceed with caution.

 


Conditions
Nearest Town Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Rock Springs
NWS Forecast
Between the Utah State Line and Mile Marker 502, Southbound Closure Gate Dry None US 191 from milepost 502.4 to 551.39
Weight restriction: Nov 15-April 1 no vehicles with a GVWR in excess of 40,000 pounds.
Sep 28, 2021 01:06 am  
Between Mile Marker 502, Southbound Closure Gate and I-80 Dry None US 191 from milepost 502.4 to 551.39
Weight restriction: Nov 15-April 1 no vehicles with a GVWR in excess of 40,000 pounds.
Sep 28, 2021 01:06 am    
Between Rock Springs and Mile Marker 12, Yellowstone Rd Dry None   Sep 28, 2021 01:06 am    
Farson
NWS Forecast
Between Mile Marker 12, Yellowstone Rd and Farson Dry None   Sep 28, 2021 01:06 am
Between Farson and WY 351 Dry None   Sep 28, 2021 01:06 am
Pinedale
NWS Forecast
Between WY 351 and Pinedale Dry None US 191 at milepost 88.23
Weight restriction: --, --, 33, --, --
Sep 28, 2021 01:06 am  
Between Pinedale and Daniel Jct Dry None   Sep 28, 2021 01:06 am  
Between Daniel Jct and Bondurant Dry None   Sep 28, 2021 01:06 am
Jackson
NWS Forecast
Between Bondurant and Hoback Jct Dry Falling Rock   Sep 28, 2021 01:06 am    
Between Hoback Jct and Jackson Dry None US 26 , US 89 , US 189 , US 191 from milepost 141.5 to 145.1
Width restriction: 12 ft
W BROADWAY AVE, US 26 , US 89 , US 189 , US 191 from milepost 152.09 to 155.21
Width restriction: 15 ft, Height restriction: 15 ft
Sep 28, 2021 01:06 am  
Between Jackson and the S Boundary of Grand Teton Nat'l Park Dry None W BROADWAY AVE, US 26 , US 89 , US 189 , US 191 from milepost 152.09 to 155.21
Width restriction: 15 ft, Height restriction: 15 ft
Sep 28, 2021 01:06 am    
Between the S Boundary of Grand Teton Nat'l Park and Airport Junction Road Dry None   Sep 28, 2021 01:06 am    
Between Airport Junction Road and Moose Dry None   Sep 28, 2021 01:06 am    
Between Moose and Moran Jct Dry None   Sep 28, 2021 01:06 am    
Between Moran Jct and Flagg Ranch Dry None   Sep 28, 2021 01:06 am    
Between Flagg Ranch and the S Boundary of Yellowstone Nat'l Park Dry None   Sep 28, 2021 01:06 am    

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Town(s) Milepost(s) Surface Delays Last Updated
Rock Springs-Farson (US 191) NHPP-N131056 Clint Lockman
307-389-7824
clint.lockman@wyo.gov
Mountain Construction Company
Lovell, WY
307-548-7186
2021-Jun-26 2021-Oct-31 Grading, milling plant mix, bituminous pavement surfacing, chip seal and miscellaneous work on approximately 11.80 miles on US 191 beginning at mp 21.0 between Rock Springs and Farson   21 to 32.8 Paved 20 minute delays with stopped conditions, on Mon-Fri Jul 23, 2021 06:34 pm
Milling and paving operations Snake River Bridge n/a 2021-Jul-19 2021-Oct-31 The Wyoming Department of Transportation will begin milling and paving operations today Monday, July 19, on the old pavement south of the bridge over the Snake River on US 26/89/189/191 and also on the old pavement near the retaining wall construction south of the wildlife bridge. Traffic will be moved onto crushed base. Crews will maintain a single lane in each direction during operations. Speeds will be reduced and delays should be expected. Drivers are advised to plan accordingly or try and avoid the area.   145.9 to 146 Gravel Expect delays Aug 04, 2021 06:54 am
Snake River South N104066 N104079 N104A08 Bob Hammond
307-732-9602
Oftedal Construction, Inc.
Miles City, MT
406-232-5911
2020-Apr-01 2022-Jul-31 Road work on 3.5 miles of US 26/89 between Hoback Junction and Jackson. Traffic will be placed on a gravel surface through the section. The speed limit will be reduced through the area. WYDOT is asking travelers to plan accordingly and allow themselves ample time to reach their destination. Expect up to twenty minute (20) delays 8:30 a.m. 4:30 p.m. There will be no delays during commuter hrs from 6:30 8:30 a.m. & 4:30 6:30 p.m. Motorcycles should exercise caution.   141.6 to 145 Paved 20 minute delays, from 0830 to 1630 May 11, 2021 03:05 pm

*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.


Contact Us
Copyright 2021 Disclaimer Privacy Policy Media