District 1 (Southeast) I80: The Wagonhound Rest Area is closed until further notice near Arlington at milepost 267.

District 3 (Southwest) WY22: Weight limit of 60,000 GVW is in effect over Teton Pass between milepost 7 and the Idaho State Line.

Green River Tunnel Media Kit

I80: Green River tunnel Eastbound lane, head to head traffic at milepost 90, speed limit 35 mph, legal width only.

I80: Bitter Creek Rest Area is closed until further notice WESTBOUND near Patrick Draw at milepost 143.5.



Conditions
Route Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Evanston
NWS Forecast
Between the Utah State Line and Evanston Dry None None Oct 3, 2025, 10:07 PM    
Between Evanston and Exit 18, US 189 Dry None None Oct 3, 2025, 10:07 PM    
Between Exit 18, US 189 and Exit 30, Bigelow Rd Dry None None Oct 3, 2025, 10:07 PM    
Lyman
NWS Forecast
Between Exit 30, Bigelow Rd and Exit 39, WY 412/414 Dry None None Oct 3, 2025, 10:07 PM    
Between Exit 39, WY 412/414 and MM 57, Sweetwater County Line Dry None None Oct 3, 2025, 10:07 PM    
Granger
NWS Forecast
Between MM 57, Uinta County Line and Exit 66, Granger Jct Dry None None Oct 3, 2025, 10:07 PM    
Between Exit 66, Granger Jct and Exit 83, La Barge Rd Dry None None Oct 3, 2025, 10:07 PM    
Rock Springs
NWS Forecast
Between Exit 83, La Barge Rd and Exit 91, Flaming Gorge Way Dry None None Oct 3, 2025, 10:07 PM    
Between Exit 91, Flaming Gorge Way and Exit 104, Rock Springs Dry None None Oct 3, 2025, 10:07 PM    
Between Exit 104, Rock Springs and Exit 111, Airport and Baxter Roads Dry None None Oct 3, 2025, 10:07 PM    
Between Exit 111, Airport and Baxter Roads and Point of Rocks Dry None None Oct 3, 2025, 10:07 PM    
Patrick Draw
NWS Forecast
Between Point of Rocks and Exit 142, Bitter Creek Dry None None Oct 3, 2025, 10:07 PM    
Between Exit 142, Bitter Creek and Exit 158, Tipton Rd Dry None None Oct 3, 2025, 10:07 PM    
Wamsutter
NWS Forecast
Between Exit 158, Tipton Rd and Wamsutter Dry None None Oct 3, 2025, 10:07 PM    
Between Wamsutter and Exit 187, Creston Jct Dry None None Oct 3, 2025, 10:07 PM    
Rawlins
NWS Forecast
Between Exit 187, Creston Jct and Rawlins Dry None None Oct 3, 2025, 11:00 PM    
Between Rawlins and Exit 235, Walcott Jct Dry None None Oct 3, 2025, 11:00 PM    
Elk Mountain
NWS Forecast
Between Exit 235, Walcott Jct and Exit 255, WY 72 Dry with Strong Winds None None Oct 4, 2025, 12:09 AM    
Between Exit 255, WY 72 and Exit 267, Wagonhound Rd Dry with Strong Winds None None Oct 4, 2025, 12:09 AM    
Arlington
NWS Forecast
Between Exit 267, Wagonhound Rd and Arlington Dry None None Oct 3, 2025, 11:00 PM    
Between Arlington and Exit 279, Cooper Cove Rd Dry None None Oct 3, 2025, 11:00 PM    
Laramie
NWS Forecast
Between Exit 279, Cooper Cove Rd and Exit 290, Quealy Dome Dry None None Oct 3, 2025, 11:00 PM    
Between Exit 290, Quealy Dome and Laramie Dry None None Oct 3, 2025, 11:00 PM    
Between Laramie and Exit 323, Happy Jack Rd Dry None None Oct 3, 2025, 11:00 PM    
Between Exit 323, Happy Jack Rd and Exit 335, Buford Dry None None Oct 3, 2025, 11:00 PM    
Cheyenne
NWS Forecast
Between Exit 335, Buford and Exit 348, Otto Rd Dry None None Oct 3, 2025, 11:00 PM    
Between Exit 348, Otto Rd and Exit 359, Junction I-25 Dry None None Oct 3, 2025, 11:00 PM    
Between Exit 359, Junction I-25 and Exit 364, College Drive Dry None None Oct 3, 2025, 11:00 PM    
Between Exit 364, College Drive and Exit 370, Archer Interchange Dry None None Oct 3, 2025, 11:00 PM    
Between Exit 370, Archer Interchange and Exit 377, WY 217 Dry None None Oct 3, 2025, 11:00 PM    
Pine Bluffs
NWS Forecast
Between Exit 377, WY 217 and Pine Bluffs Dry None None Oct 3, 2025, 11:00 PM    
Between Pine Bluffs and the Nebraska State Line Dry None None Oct 3, 2025, 11:00 PM    

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Road Milepost(s) Surface Delays Last Updated
Cheyenne - Pine Bluffs (Burns Interchange Section) I806208 Craig Cox
777-4404 / 631-8197
Simon Contractors and Subsidiaries
Cheyenne , WY
307-632-7900
Jun 8, 2025 Nov 29, 2026 Concrete slab repair, paving, structure replacement. The WY 213/WY 214 underpass will be closed for repairs. All ramps remain open. 382.150 to 393.400 Paved Expect delays Aug 24, 2025, 04:43 AM
Roundtop-Central Interchange I80 from MP 357.66 to 362 I806211 Craig Cox
777-4404 / 631-8197
Simon Contractors and Subsidiaries
Cheyenne , WY
307-632-7900
Feb 20, 2025 Oct 15, 2025 Mill and Overlay 357.660 to 362.000 Paved None Oct 2, 2025, 02:20 AM
District 1 Bridge Rehab B251005 Diego Fronza
307-321-1671
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
Apr 27, 2025 Oct 30, 2025 Bridge Rehabilitation involving structure, traffic control, asphalt paving, and milling work at various locations in District 1 339.200 to 339.300 Paved Expect delays Apr 16, 2025, 08:46 AM
I-80 mp 141-155 between Patrick Draw and Wamsutter NHPPI-SIB-I803152 Brad McCullough
352-3036(c) 522-8948
Kilgore Companies, LLC and Sub.
Magna , UT
801-250-0132
Mar 23, 2025 Oct 30, 2026 Milling, paving, bridge rehab, rest area resurfacing, traffic control and miscellaneous work. Expect construction congestion with slower speeds and delays. 141.000 to 155.000 Paved Expect delays Aug 16, 2025, 12:54 AM
Roadwork I-80 both directions mp 129-139 near Point of Rocks I803153 Clint- Office Lockman
McGarvin-Moberly Construction Co.
Worland , WY
307-347-4268
Sep 15, 2024 Oct 30, 2025 Milling and paving with minor guardrail work. Single lane closures at various locations as paving for crossovers and miscellaneous patching is completed. Traffic will be reduced to 45 mph at various locations. Expect construction congestion with slower speeds and delays. 130.000 to 138.000 Paved Expect delays Aug 16, 2025, 12:53 AM
Bridge Rehab I-80 WB mp 104 near Rock Springs SCP-TC-B233034 Brad McCullough
352-3036(c) 522-8948
DeBernardi Construction Company, Inc.
Rock Springs , WY
307-382-8034
Sep 21, 2025 Oct 30, 2025 Rehabilitation of westbound structure on I-80 at MP 104.67. The roadway will have a 16 foot width restriction throughout the duration of construction. 104.500 to 106.000 Paved Construction zone speed limit 45 MPH Sep 22, 2025, 11:31 AM
District 3 Slab Replacement Rock Springs I-80 EB MM 101.5 -103, MM 87.5 - 89 STP-PM-B253035 Brad McCullough
352-3036(c) 522-8948
DeBernardi Construction Company, Inc.
Rock Springs , WY
307-382-8034
Oct 2, 2025 Oct 30, 2025 Replacement of concrete slabs on eastbound I-80 in Green River. The roadway will be open during the duration of construction but will have a 16 foot width restriction. 101.500 to 103.000 Paved 20 minute delays with stopped conditions Oct 3, 2025, 04:14 AM
Roadwork I-80 WB mp 101 near Rock Springs Roadwork I-80 WB mp 101 near Rock Springs None None Sep 30, 2025 Oct 4, 2025 Roadwork I-80 WB mp 101 near Rock Springs 101.000 to 101.000 Paved Right lane closed Oct 1, 2025, 09:20 AM
Green River Tunnels Road Work, I-80 Both Directions, Milepost 88-91 103 Clint Lockman
None Feb 20, 2025 Oct 30, 2025 Roadwork both directions, expect head-to-head traffic, with a speed limit of 35 mph in the work zone. Legal width only strictly enforced. On May 20, 2025 EB traffic will be rerouted through Green River beginning at 0900. Expect rerouting for 4-5 hours while crews complete work. 88.000 to 91.000 Paved Expect delays May 19, 2025, 11:49 AM
I-80 Road Work MM 82.75-86.5 near Greenriver NHPPI-I802201 Clint Lockman
Acme Concrete Paving, Inc.
Spokane , WA
509-242-1234
May 28, 2025 Oct 30, 2025 Grinding and concrete slab replacement involving milling, crack sealing, concrete paving, traffic control, signing and fencing work on I80 at mile markers 82.75 - 86.5. 82.750 to 86.500 Paved Expect delays Jul 22, 2025, 06:13 AM
Road work near Evanston I-80 MM 9.25 - 11, 14.25 - 16 EASTBOUND Road work Brad McCullough
352-3036(c) 522-8948
None Jul 15, 2025 Oct 30, 2025 Rehabilitation of eastbound structure on I-80 at MP 10.68. The roadway will have a 12 foot width restriction throughout the duration of construction. Rehabilitation of eastbound structure on I-80 at MP 15.64. The roadway will have a 12 foot width restriction throughout the duration of construction. 14.250 to 16.000 Paved Left lane closed Sep 9, 2025, 12:26 AM
*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.