Travel information for Interstate 80 is as follows:

Last update at: Jul 12, 2020 12:23 pm
Frequently Asked Questions Closures & Advisories
Search Conditions By Map
Search By City
Search By District
Variable Speed Limits
Chain Law
Neighboring States

District Comments
District 1 (Southeast) Wyoming Office of Homeland Security COVID Information

I80: Roadwork, Travel lane blocked EASTBOUND between Laramie and Buford from milepost 317 to 323.

ALWAYS USE CAUTION AND FOLLOW SPEED REDUCTIONS IN CONSTRUCTION ZONES.

I80: The Ft. Steele Rest Area located between Rawlins and Walcott Jct at milepost 228 is CLOSED until further notice. Motorists still have access to facilities in neighboring communities. https://bit.ly/2MBWHxQ

US85: The Meridan Rest Area located between Cheyenne and Torrington at milepost 53.85 is CLOSED until further notice.

I80: The Wagonhound Rest Area near Elk Mountain at milepost 267 is CLOSED until further notice.

 

District 3 (Southwest) I80: Roadwork, Right lane blocked EASTBOUND near Rock Springs from milepost 99 to 101, Proceed with caution.

WY22: Weight limit of 60,000 GVW in effect and brake checkpoints over Teton Pass between Jackson and the Idaho state line, from milepost 7 to 17.

WY22: Narrow road between Jackson and the Idaho state line from milepost 7 to 17.

I80: Bridge damage, reduced speed in effect WESTBOUND near Lyman at milepost 48, Prepare to slow down.

I80: Road damage WESTBOUND near Green River from milepost 80 to 81, Proceed with caution.

Wyoming Office of Homeland Security COVID Information

I80: Roadwork, Left lane blocked EASTBOUND near Rock Springs from milepost 83 to 91, Expect delays. The Star Valley Rest Area on US89 at milepost 97.5 is CLOSED. Motorists still have access to facilities in neighboring communities. https://bit.ly/2MBWHxQ

 


Conditions
Nearest Town Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Evanston
NWS Forecast
Between the Utah State Line and Evanston Dry None   Jul 12, 2020 12:23 pm
Between Evanston and Exit 18, US 189 Dry None   Jul 12, 2020 12:23 pm
Between Exit 18, US 189 and Exit 30, Bigelow Rd Dry None   Jul 12, 2020 12:23 pm
Lyman
NWS Forecast
Between Exit 30, Bigelow Rd and Exit 39, WY 412/414 Dry None   Jul 12, 2020 12:23 pm    
Between Exit 39, WY 412/414 and MM 57, Sweetwater County Line Dry None   Jul 12, 2020 12:23 pm
Granger
NWS Forecast
Between MM 57, Uinta County Line and Exit 66, Granger Jct Dry None   Jul 12, 2020 12:23 pm
Between Exit 66, Granger Jct and Exit 83, La Barge Rd Dry None   Jul 12, 2020 12:23 pm
Rock Springs
NWS Forecast
Between Exit 83, La Barge Rd and Exit 91, Flaming Gorge Way Dry None   Jul 12, 2020 12:23 pm
Between Exit 91, Flaming Gorge Way and Exit 104, Rock Springs Dry None   Jul 12, 2020 12:23 pm    
Between Exit 104, Rock Springs and Exit 111, Airport and Baxter Roads Dry None   Jul 12, 2020 12:23 pm  
Between Exit 111, Airport and Baxter Roads and Point of Rocks Dry None   Jul 12, 2020 12:23 pm
Patrick Draw
NWS Forecast
Between Point of Rocks and Exit 142, Bitter Creek Dry None   Jul 12, 2020 12:23 pm
Between Exit 142, Bitter Creek and Exit 158, Tipton Rd Dry None   Jul 12, 2020 12:23 pm
Wamsutter
NWS Forecast
Between Exit 158, Tipton Rd and Wamsutter Dry None   Jul 12, 2020 12:23 pm  
Between Wamsutter and Exit 187, Creston Jct Dry None   Jul 12, 2020 12:23 pm
Rawlins
NWS Forecast
Between Exit 187, Creston Jct and Rawlins Dry None   Jul 12, 2020 12:00 pm  
Between Rawlins and Exit 235, Walcott Jct Dry None   Jul 12, 2020 12:00 pm
Elk Mountain
NWS Forecast
Between Exit 235, Walcott Jct and Exit 255, WY 72 Dry None   Jul 12, 2020 12:00 pm
Between Exit 255, WY 72 and Exit 267, Wagonhound Rd Dry None   Jul 12, 2020 12:00 pm
Arlington
NWS Forecast
Between Exit 267, Wagonhound Rd and Arlington Dry None   Jul 12, 2020 12:00 pm
Between Arlington and Exit 279, Cooper Cove Rd Dry None   Jul 12, 2020 12:00 pm
Laramie
NWS Forecast
Between Exit 279, Cooper Cove Rd and Exit 290, Quealy Dome Dry None   Jul 12, 2020 12:00 pm
Between Exit 290, Quealy Dome and Laramie Dry None   Jul 12, 2020 12:00 pm  
Between Laramie and Exit 323, Happy Jack Rd Dry None   Jul 12, 2020 12:00 pm  
Between Exit 323, Happy Jack Rd and Exit 335, Buford Dry None   Jul 12, 2020 12:00 pm
Cheyenne
NWS Forecast
Between Exit 335, Buford and Exit 348, Otto Rd Dry None   Jul 12, 2020 12:00 pm
Between Exit 348, Otto Rd and Exit 359, Junction I-25 Dry None   Jul 12, 2020 12:00 pm
Between Exit 359, Junction I-25 and Exit 364, College Drive Dry None   Jul 12, 2020 12:00 pm    
Between Exit 364, College Drive and Exit 370, Archer Interchange Dry None   Jul 12, 2020 12:00 pm    
Between Exit 370, Archer Interchange and Exit 377, WY 217 Dry None   Jul 12, 2020 12:00 pm
Pine Bluffs
NWS Forecast
Between Exit 377, WY 217 and Pine Bluffs Dry None   Jul 12, 2020 12:00 pm  
Between Pine Bluffs and the Nebraska State Line Dry None   Jul 12, 2020 12:00 pm  

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Town(s) Milepost(s) Surface Delays Last Updated
Herrick Lane - Rawlins/Laramie NHPPI-I805174 Kory Cramer
307-745-2137
Simon Contractors - Laramie
Laramie, WY
307-760-4022
2020-May-04 2020-Oct-31 Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, (recycle), plant mix wearing course, lane rental, bridge rehabilitation and miscellaneous work on approximately 8.00 miles on I-80 EBL & WBL beginning at RM 291.46 between Rawlins and Laramie. Motorists should stay alert and slow down through the work zone, as reduced speed limits and lane closures are likely through portions of the project.   291.5 to 299.46 Paved Expect delays May 03, 2020 10:59 am
Carbon County Paving Operations 1 2020-Jul-09 2020-Aug-03 Paving operations at the following locations: I-80 near Elk Mountain between mile markers 249-255; July 15th, I-80 through Rawlins at mile markers 206, 219 and 234 eastbound as well as 209 and 219 westbound. Crews may also be working on off- and on-ramps during this portion of the project; July 22nd, WYO 70 near mile markers 48-49, after which they will move on to portions WYO 130/230 around mile markers 6-8; July 29th, US30 in Medicine Bow between mile markers 248-250. Lane closures, ramp closures, flaggers and other traffic control measures are likely to be in place. Operations are paused Friday-Sunday, but traffic control devices may still be in place.   206 to 206 Paved Expect delays, on Mon-Fri Jul 12, 2020 11:19 am
  209 to 209 Expect delays, on Mon-Fri Jul 12, 2020 11:19 am
  219 to 219 Expect delays, on Mon-Fri Jul 12, 2020 11:19 am
  234 to 234 Expect delays, on Mon-Fri Jul 12, 2020 11:19 am
  249 to 255 Expect delays, on Mon-Fri Jul 12, 2020 11:19 am
I-80 318.84 - 324 including 323 Bridge Rehab PI805178 Steve Cook
307-760-2595
Simon Contractors - Laramie
Laramie, WY
307-760-4022
2020-May-26 2020-Oct-31 Milling, paving, bridge rehabilitation and miscellaneous work on I-80 from milepost 318.84- 324. A 12 foot width restriction is in place at the Happy Jack Interchange with a 10 foot width restriction in place on the bridge at mp 323.   318.84 to 324 Paved, Milled Expect delays May 31, 2020 11:14 am
District 3 Bridge Rehab STP-B183102 Damon Newsome
307-677-3622
damon.newsome@wyo.gov
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2020-Mar-16 2020-Oct-31 Bridge Rehabilitation   0 to 185 Paved None Mar 16, 2020 02:50 pm
Lyman - Granger Jct (County Line West) I801182 Damon Newsome
307-789-3363
Lewis & Lewis Inc.
Rock Springs, WY
307-362-7948
2020-Mar-17 2021-Oct-31 Grading, milling, placing crushed base and bituminous pavement surfacing, plant mix wearing course, bridge rehab, and misc. work.   49.06 to 57.04 Paved Construction zone speed limit 45 MPH Apr 18, 2020 07:22 am
District 3 Bridge Rehab - Evanston STP-BR-B183012 Damon Newsome
307-789-3363
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2020-Apr-13 2020-Jul-31 Grading, placing crushed base and bituminous pavement surfacing, bridge rehabilitation and miscellaneous work at various locations. Traffic will be head to head at RM 3.45 (EB), RM 4.51 (WB), RM 18.29 (EB and WB), RM 23.60 (EB and WB) and RM 23.91 (EB). Single lane traffic control environments with reduced speeds up to 45 mph.   3.45 to 23.91 Paved Construction zone speed limit 45 MPH May 03, 2020 11:06 am
I-80 Point of Rocks West NHPPI-I802200__ Peter Stinchcomb
307-352-3000
Kilgore Companies, LLC and Sub.
Magna, UT
801-250-0132
2020-Mar-27 2020-Oct-31 Minor reconstruction, bridge removal and replacement, and resurfacing of the eastbound lane. Two-way traffic will be carried in the westbound lane while the eastbound lane is under construction. A width restriction of 16 feet is in effect throughout the project. Construction zone speed limit 65 mph with traffic diverted to one lane on the westbound side, a width restriction of 16ft is now in effect.   120 to 130.5 Paved Construction zone speed limit 65 MPH May 04, 2020 08:44 am
I-80 Hillsdale Bridge Replacement 1 Kevin Erickson
3076318322
kevin.erickson@wyo.gov
Simon Contractors and Subsidiaries
Cheyenne, WY
307-632-7900
2020-Apr-27 2021-Oct-31 Bridge Replacement: Travelers on I-80 should expect delays near Hillsdale between MP 372 and milepost 382. In addition to the lane changes, other delays like reduced speed limits are likely through the work zone. Motorists should slow down, stay alert and follow all traffic signs and flaggers as they pass through.Travelers on County Road 140/Stuckey Road can expect night closures while the old Hillsdale structures are torn down and the new are built.   372 to 382 Paved Expect delays Apr 27, 2020 08:16 am
LaBarge Interchange West - WBL NHPPI-I802205 Clint- Office Lockman
307-352-3039
Interstate Highway Construction, Inc.
Englewood, CO
303-790-9100
2020-Mar-30 2020-Oct-31 The Wyoming Department of Transportation, along with contract crews from Interstate Highway Construction, Inc., will be closing the westbound off-ramp at exit 83 on Interstate 80, at the La Barge Interchange, on Monday, May 18. Crews have a 30-day window for the closure to complete the work, but the crew is hoping to have the work done in two weeks, weather permitting. Traffic will need to utilize the Interstate 80 Covered Wagon Interchange at exit 85 or the Westvaco Interchange at exit 72 to access WYO 372 towards Ciner and Exxon. The Covered Wagon and Westvaco Interchanges can also be used to access WY 374 (Little America Service Road) towards Genesis Alkali and Harborlite. WYDOT encourages industrial and mine traffic traveling from Rock Springs and Green River to utilize the Jamestown service road or the Covered Wagon Interchange to access WYO 372, to avoid the longer detour to the Westvaco Interchange   76 to 84 Paved Expect delays May 11, 2020 09:54 am

*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.