US85: Meridan Rest Area closed, until further notice between Cheyenne and Torrington at milepost 53.8.

ROAD WORK IN THE FOLLOWING LOCATIONS:

I25: Exit 12, Central Avenue exit SOUTHBOUND near Cheyenne is closed. Use alternate route.

I80: Left lane blocked EASTBOUND between Laramie and Buford at milepost 322.

I80: Right lane blocked WESTBOUND between Buford and Laramie at milepost 323.

ALWAYS USE CAUTION AND FOLLOW SPEED REDUCTIONS IN CONSTRUCTION ZONES.

 

District 2 (Central) Wyoming Office of Homeland Security COVID Information

I25: Roadwork, Left lane blocked SOUTHBOUND near Casper at milepost 187.75, Proceed with caution.

 

District 4 (Northeast) Wyoming Office of Homeland Security COVID Information

 


Conditions
Nearest Town Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Cheyenne
NWS Forecast
Between the Colorado State Line and Cheyenne Dry None   Jun 07, 2020 02:55 am
Between Cheyenne and Exit 29, Whitaker Rd Dry None   Jun 07, 2020 02:55 am
Chugwater
NWS Forecast
Between Exit 29, Whitaker Rd and Chugwater Dry None   Jun 07, 2020 02:55 am
Between Chugwater and Exit 73, WY 34 Dry None   Jun 07, 2020 02:55 am
Wheatland
NWS Forecast
Between Exit 73, WY 34 and Wheatland Dry None   Jun 07, 2020 02:55 am
Between Wheatland and Exit 92, US 26 Dry None   Jun 07, 2020 02:55 am  
Glendo
NWS Forecast
Between Exit 92, US 26 and Glendo Dry None   Jun 07, 2020 02:55 am
Between Glendo and Exit 126, US 18/20 Dry None   Jun 07, 2020 02:55 am
Douglas
NWS Forecast
Between Exit 126, US 18/20 and Douglas Dry None   Jun 07, 2020 02:55 am  
Between Douglas and Glenrock Dry None   Jun 07, 2020 02:55 am
Casper
NWS Forecast
Between Glenrock and Casper Dry None   Jun 07, 2020 02:55 am
Between Casper and Exit 210, Horse Ranch Creek Rd Dry None   Jun 07, 2020 02:55 am
Midwest
NWS Forecast
Between Exit 210, Horse Ranch Creek Rd and Exit 227, WY 387 Dry None   Jun 07, 2020 02:55 am
Between Exit 227, WY 387 and Exit 235, Tisdale Mtn Rd Dry None   Jun 07, 2020 02:55 am
Kaycee
NWS Forecast
Between Exit 235, Tisdale Mtn Rd and Kaycee Dry None   Jun 07, 2020 02:55 am
Between Kaycee and Exit 265, Reno Rd Dry None   Jun 07, 2020 02:55 am
Buffalo
NWS Forecast
Between Exit 265, Reno Rd and Buffalo Dry None   Jun 07, 2020 02:55 am  

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Town(s) Milepost(s) Surface Delays Last Updated
I-25 Cheyenne Chugwater (Randall Horse Creek Section) I251168 Wayne Shenefelt
307-630-8462
Simon Contractors and Subsidiaries
Cheyenne, WY
307-632-7900
2020-Apr-20 2020-Oct-31 Work on approximately 5.40 miles on I-25 beginning at RM 11.53 between Cheyenne and Chugwater. Crews will attempt to limit both the length and duration of necessary lane closures during this phase of the work, but delays are likely. Along with lane closures, the project will see additional traffic control measures including reduced speed limits and occasional full or partial ramp closures. The Interstate 25 northbound on-ramp to Central Avenue is temporarily closed and is estimated to last 7-10 days, weather permitting. Motorists planning to use the Central Avenue on-ramp to drive northbound on I-25 will need to plan an alternate route; a detour will be in place with signage to help guide travelers. At this time, the on-ramp leading traffic from Central Avenue to go northbound on I-25 will remain open, but it is likely to be temporarily closed for slab repairs in early June.   11.53 to 16.93 Paved Expect delays Jun 02, 2020 12:06 pm
D2 Bridge Rehab I-25 mp 33 B192017 Tim Rasnake
307-322-6500
Dietzler Construction Corporation
Torrington, WY
307-333-7552
2020-Apr-01 2020-Jun-30 Bridge Rehabilitation on I-25 at milepost 33.   33.23 to 33.23 Paved None Apr 05, 2020 08:45 am
District 2 Bridge Rebab I-25 mp 123.52 B202010 3 Tim Rasnake
307-322-6500
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2020-May-27 2020-Jul-31 Various bridge rehabilitation work.   123.52 to 123.52 Paved Expect delays May 27, 2020 02:48 pm
District 2 Contract Patch B202011 Brooke Allen
307-473-3227
Knife River
Cheyenne, WY
307-634-5455
2020-Apr-20 2020-Oct-31 Milling plant mix, bituminous pavement surfacing and miscellaneous work. No delays expected on I-25.   160 to 179 Paved None Apr 29, 2020 12:14 pm
District 1 Bridge Rehab STP-PM-B191004 Kevin Erickson
3076318322
kevin.erickson@wyo.gov
S & S Builders, LLC
Gillette, WY
307-686-5659
2020-Mar-01 2020-Sep-30 Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, concrete slab replacement, bridge rehabilitations and miscellaneous work at various locations in Transportation District 1 located on I-25 at mileposts 10.78 and milepost 10.59. A 12 ft. width restriction will be in place through the work zone.   10.59 to 10.59 Paved None Jun 02, 2020 05:11 pm
  10.78 to 10.78 Paved Expect delays Jun 02, 2020 05:11 pm
District 2 Bridge Rehabilitation MP 39.24 SB B202010 Tim Rasnake
307-322-6500
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2020-May-11 2021-Jul-31 Bridge Rehabilitation on I-15 @ MP 39.24 SB.   39.24 to 39.24 Paved None May 11, 2020 10:09 am
District 2 Bridge Rehabiliation I-25 mp 35.8 B202010 2 Tim Rasnake
307-322-6500
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2020-May-08 2020-Jul-31 Bridge rehabilitation.   35.8 to 35.8 Paved None May 08, 2020 03:40 pm
District 2 Bridge Rehabilitation I-25 MP 41.84 B202010 Tim Rasnake
307-322-6500
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2020-Mar-16 2021-Jul-31 Bridge Rehabilitation. Oversize loads can detour from Exit 39 via 1-25 Service Road to Exit 47   41.84 to 41.84 Paved None Apr 05, 2020 08:47 am

*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.


Contact Us
Copyright 2020 Disclaimer Privacy Policy Media