| Construction Projects | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Project Name | Project Number | WYDOT Contact | Contractor Contact | Start Date | Completion Date | Description | Road | Milepost(s) | Surface | Delays | Last Updated |
| Yellowstone National Park - Cody, Palisades Section | N311107 | None | Mountain Construction Company Lovell , WY 307-548-7186 |
May 1, 2026 | Oct 31, 2026 | Overlay and Chip Seal with slope flattening, guardrail repair and drainage work on approximately 9.85 miles on US 14/16/20 beginning at RM 10.249 and ending at RM 20.102. | 10.25 to 20.1 | Paved | 20 minute delays with stopped conditions | May 4, 2026, 11:11 AM | |
| Cody - Powell, US 14A/Powell West | N291067 | Todd Frost 307-272-3341 todd.frost@wyo.gov |
Mountain Construction Company Lovell , WY 307-548-7186 |
Apr 12, 2026 | Oct 30, 2026 | Mill, Overlay, Chip Seal, ADA upgrades, replacement of broken curb and gutter, double gutter, and sidewalk, and slope flattening work on approximately 5.10 Miles on US 14A beginning at RM 18.69 to RM 23.79. Expect two way traffic (one lane each direction) on one half of the roadway while work is being completed on the other half of the roadway for the entire length of the project. Expect reduced speeds through the work zone with short stops to allow equipment and haul trucks to enter and exit the work zone. | 18.69 to 23.79 | Paved | Expect delays | Jul 28, 2026, 09:05 AM | |
| Bridge Rehabilitation WY 120 MP 102.68 near Cody | B265001 | Kelly Erickson 307-864-6114 |
Coldwater Group Inc , 801-745-7091 |
Aug 17, 2026 | Oct 31, 2026 | Repairing bridge deck; milling asphalt pavement, placing asphalt pavement and bridge deck overlay; application of bridge deck membrane; and installing guardrail. | 102.67 to 102.69 | Paved | 10 minute delays | Aug 14, 2026, 03:35 PM | |
| *Chain Law - Level 1 Definition |
| **Chain Law - Level 2 Definition |
| Other Definitions |
| Impact Levels | Description / Recommended Action |
|---|---|
| Low | Minimal impacts expected, use general caution. |
| Moderate | Some impacts expected, use extra caution. Stay alert for changing road and weather conditions. |
| High | Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time. |
| CLOSED | Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment. |
| Seasonal / Long-Duration Event | Impact level used to distinguish long-duration events from emergent events. |
|
|
|